DE
On July 22, 2024, the transmission system operators submitted a draft application to the BNetzA to build the envisaged H2 core grid. With a planned total length of 9,666 km (6,006 mi), it will predominantly consist of converted natural gas pipelines (about 60 percent). The Doing Hydrogen route that...